Tenant Improvements
Commercial Tenant Improvements in Canton, GA: Owner Guide
TI allowances, timelines, scope, and what Canton landlords and tenants should expect before signing a commercial lease.

Commercial tenant improvements (TI) are the build out work that turns a raw or vanilla shell into a usable office, retail, restaurant, or medical space. If you own a commercial property in Canton or you are signing a lease in Cherokee County, here is what you actually need to know.
What counts as a tenant improvement
TI work usually includes:
- Demising walls and interior partitions
- Drop ceilings, lighting, and finishes
- HVAC distribution and zoning
- Electrical, data, and plumbing within the space
- Storefront, signage, and ADA compliant entries
- Restrooms and break rooms
Anything that touches the building structure, roof, or main utility service usually sits outside TI and falls under landlord work or capital improvements.
TI allowance basics
A TI allowance is a dollar amount per square foot that the landlord contributes toward the build out. In North Metro Atlanta in 2026, typical ranges look like this:
- Office shell, second generation space: $15 to $50 per sq ft
- Retail strip, vanilla shell: $25 to $60 per sq ft
- Restaurant, white box to full build out: $40 to $100 per sq ft
- Medical and dental: $30 to $80 per sq ft
If the tenant scope exceeds the allowance, the tenant funds the overage directly or amortizes it into rent. The number matters, but the lease language around timing, control, and unused allowance matters just as much.
Realistic timeline
For a typical 3,000 to 8,000 sq ft Canton or Woodstock TI:
- Design and permitting: 4 to 10 weeks
- Permit review by jurisdiction: 2 to 8 weeks
- Construction: 6 to 16 weeks
- Inspections and certificate of occupancy: 1 to 3 weeks
Restaurants and medical run longer. Office and basic retail can move faster if the shell is in good shape.
Common Canton and Cherokee County issues
- Older shells often need HVAC capacity upgrades to meet current code
- Grease, gas, and exhaust upgrades drive restaurant scope
- ADA compliance for restrooms and entries gets triggered on changes of use
- Power service may need a meter upgrade or a transformer change
A good GC catches these in the first walk through, not after demolition.
Tips for owners and investors
- Define what is landlord work versus tenant work in writing
- Set a clear deadline for tenant design submittal
- Require permitted drawings and a licensed GC, not a handyman
- Hold a retainage and tie final payment to certificate of occupancy
- Inspect with your own representative at substantial completion
Tips for tenants
- Walk the space with a GC before you sign
- Get a budget estimate against the TI allowance
- Build float into your opening date for permit and inspection delays
- Confirm who pays for plans, permits, and impact fees in the lease
Working with Nobo
We work both sides of TI projects in Canton. We help owners deliver vanilla shells and white boxes that lease faster, and we help tenants get into clean, code compliant space on schedule. Licensed and insured, family owned, based in Canton.
Talk to us before you sign. We respond within 24 hours.


